The scope of work includes the supply of all engineering, detailed design, documentation, certification, labour, materials, consumables, tools, plant and equipment for fabrication assembly, installation, testing and pre- commissioning, and preparation for transport. The switchrooms housed electrical switchgear, MCC’s, VSD’s, UPS, Fire Panels, Control Systems and IS&T equipment.